Using High Energy X-Rays and Digital Radiography Detector to Locate Lost Inspection Pig

Using High Energy X-Rays and Digital Radiography Detector to Locate Lost Inspection Pig
The Betatron high-energy X-ray system was selected to help locate a missing cleaning pig. (Photo credit: Oceaneering)

Maintaining flow assurance is a critical part of operations planning for oil and gas pipelines. The daily cost of unplanned maintenance and shutdowns can quickly accumulate. Any number of things can set back successful operations, including damage to the pipeline from corrosion, pitting, and cracking, as well as buildup from hydrates and heavy wax.

There are a variety of measures operators can take to ensure flow and integrity of operations. Often cleaning pigs, which travel through the pipeline interior to clear blockages such as wax and other debris, can be used. And, while cleaning pigs are a reliable method, failures can happen, setting back operations until the pig can be successfully retrieved.

An oil and gas pipeline operator contacted Oceaneering because a cleaning pig was stuck in one of its pipelines in the North Sea. The pig had broken, and while one portion was recovered at the onshore reception facility, the rest remained stuck at an unknown position within the pipeline and was preventing oil production to the onshore terminal. The pipeline was suspected to be full of crude oil and wax deposits.

The pipeline blockage was discovered in 2018; initial recovery operations using pressurization regimes and cleaning pigs were attempted during 2019. An unfortunate outcome of these intervention operations was that part of the cleaning pig broke off; it was recovered at the terminal pig trap. However, the pipeline operator was concerned that other loose parts from the cleaning pig may have remained in the pipeline along with the rest of the pig.

A remediation plan for this situation not only required an expedited solution, but one that had the best probability of positively identifying the missing cleaning pig’s location.

DEVELOPING A SOLUTION

There were no obvious known Non-Destructive Testing (NDT) solutions available for obtaining non-intrusive inspection (NII) data or visual images of the cleaning pig with any confidence. However, radiography had potential as a viable option for targeted inspections, including a subsea option if it had been required.

Subsea digital radiography can be used for shallow and deepwater asset integrity needs and can be provided by computed radiography (CR) or digital detector array (DDA) systems.

DDA produces a radiographic image that is instantly relayed to a topside monitoring and data collection system via a fiber-optic link. CR produces a radiographic image following exposure to a rigid or flexible phosphor imaging plate. The plates are placed in special vacuum-packed, static-free cassettes, scanned on the vessel, and interpreted using high resolution monitors.

Conventional radiography using high-energy gamma radiation was considered and rejected based on the method’s insufficient penetrating power. The target areas of the pipeline included thick tee sections and complex non-return valves (NRVs). An additional consideration was the likelihood of the larger diameter pipe potentially being full of heavy crude wax.

Oceaneering was able to recommend its Betatron high-energy X-ray system as a solution. The Betatron system, also known as a cyclotron, is normally used in a purpose-built exposure compound onshore to X-ray components with thicknesses up to 250mm. It is, however, seldom used for open site-based locations; one of the main challenges is assuring personnel safety during the operations and setting up a ‘Controlled Area.’

Oceaneering developed a timeline that included a data verification review using a similar data set from previous work involving a stuck pig and Betatron; pipeline exposures in our specialized facility at the Rosyth, U.K., dockyard; a presentation of the intended solution to the client; a detailed risk assessment of the site; and mobilization of equipment and specially trained personnel for the work from our head office in Aberdeen.

CHALLENGES

Several challenges presented themselves as the team prepared to execute the project plan, including radiation dose levels, stable power supply for Betatron, moist/salty air environment, scaffolding management, Nucleonics, and site personnel training.

To resolve the challenges, the Oceaneering team put controls in place, lead sheeting, and collimation to attenuate the beam and test exposure to ensure radiation dose levels were properly managed. Special job-specific and site-specific local rules were adhered to, and a high-energy monitor adequacy trial was completed.

The team also ensured that adequate and stable power supply to the Betatron unit could be supplied by working closely with the site’s electrical supervisor to ensure that there would be no power output spikes.

To account for the moist and salty air environment, the team ensured that equipment was supplied with adequate covers and control habitat.

A scaffolding management protocol was implemented. This consisted of a lift plan and local manual handling and storage on the scaffold itself. The accelerator was stored in the transport case overnight. The team also installed a load-bearing overhead beam with shackle to support lifting. In addition, the group enlisted a specialized engineering design team for scaffold construction.

To ensure the beam did not affect nucleonic instrumentation, the team established precise beam control and collimation directed away from the pressure plant and equipment likely to be affected. For safety and site personnel radiation awareness, the team conducted on-site training and toolbox talks. The team provided daily scheduled calls to the site for project management fitness for service (FFS) input and image assessments from Subject Matter Experts (SME).

To identify and inspect additional risks, the team conducted a daily risk assessment and perimetry regime. By using high energy X-rays coupled with a digital radiography detector, the customer was able to resume pipeline production operations after only three months.

RESULTS

Oceaneering positively confirmed the position of the cleaning pig and the absence of pig debris in the tee prevention bars and inside the NRV. The pig’s location would have prevented valve closure or even caused damage to the valve internals during the closure, which would have required a major pipeline intervention and workover to replace the valve. Around 20 m of pipeline was radiographed before the cleaning pig was eventually found. One of the main X-ray set-ups and actual X-ray digital image through the process thick wax product is shown.

This story was originally featured in ON&T Magazine's September 2021 issue. Click here to read more.

Image

Corporate Headquarters

Ocean News & Technology
is a publication of TSC Strategic

8502 SW Kansas Ave
Stuart, FL 34997
info@tscpublishing.com