Aqueos Completes Major Diving Scope for South Texas-Tuxpan Gas Pipeline

Aqueos Corporation has completed a major diving scope for the installation and commissioning of the South Texas-Tuxpan Gas Pipeline.

The South Texas-Tuxpan Gas Pipeline is being constructed by a joint venture between TransCanada (60%) and Sempra Energy’s Mexican unit IEnova (40%), also known as Infraestructura Marina del Golfo (IMG). The $3.1 billion project is being sponsored by the Federal Electricity Commission (CFE) of Mexico. Carrying US natural gas to Mexico from west Texas, this 42” pipeline is ~800km in length and runs offshore from Brownsville, TX to a shore-end approach and pump station in Altamira, MX back offshore then making landfall in Tuxpan, MX. The pipeline will deliver natural gas to power the Mexican electrical power grid. The pipeline capacity is 2600 Million cubic feet per day.

2 Splash Texas Tuxpan Project 7Aqueos’ Special Purpose Liveboating And Survey Hull vessel, SPLASH™

3 Splash Texas Tuxpan Project 3On the US side, Aqueos has completed a number of different scopes of work supporting the Project. Working without interruption since December of 2017, Aqueos performed IMCA compliant surface and Nitrox diving operations from two Aqueos provided liftboats, a DP DSV and Aqueos’ Special Purpose Liveboating And Survey Hull vessel, SPLASH™ in water depths from 5’ to 90’. Over 900 successful dives were made supporting activities including pre-lay survey and obstruction removal, assisting pipe lay with the removal of over 1,000 Mono Buoyancy Units, tail pipe stabilization with the installation of 116 articulated concrete mattresses and 129 five-ton, bolt-on concrete pipe weights and pipeline burial support of 14 miles to 3’ of cover.

Aqueos is currently providing diving support on the Mexican side of this project. To date, Aqueos has performed DP surface-diving operations from two Aqueos provided DP DSV’s, a major pipelay barge, and the Aqueos SPLASH™ in water depths from 15’ to 180’. More than 600 successful dives have been completed thus far performing inspection, survey, valve operations, pipeline head installation & removal, installation and recovery of rock filter units and pipeline span rectification. The project is ongoing and is expected to be completed in Q1 2019.

“This project is a testimony to the hard work and tenacity of our highly skilled offshore and project management teams leveraging technology to mitigate risk to ensure safety of our crews and further supports our recently attained international accreditation”, comments Aqueos President and CEO, Ted Roche. Roche further commented “we look forward to more projects in this developing market while working in this region”.

Image

Corporate Headquarters

Ocean News & Technology
is a publication of TSC Strategic

8502 SW Kansas Ave
Stuart, FL 34997
info@tscpublishing.com