FPSO Gato do Mato will be moored at a water depth of approximately 2,000 m, some 250 km off the coast of Brazil. MODEC will be responsible for the design of the hull and all related topsides facilities for the FPSO, which is projected to be moored by a SOFEC Spread Mooring system. The produced stabilized crude will be stored in the FPSO tanks, and the oil will be offloaded to shuttle tankers to go to market.
MODEC has previously delivered sixteen (16) FPSOs to Brazil and has two (2) more under construction currently. The FPSO Gato do Mato would be the second unit to be delivered directly to Shell by MODEC for operation in Brazil.
MODEC President and CEO, Hirohiko Miyata, expressed his delight in securing the FEED project: “MODEC is proud to be working on its nineteenth (19th) FPSO for Brazil and our second for Shell in Brazil. This milestone indicates the strong relationship between the two companies which now spans more than 20 years. We are excited about performing this FEED study for Shell.”