Mohawk Energy Qualifies MetalPatch on 9-5/8”Casing

Mohawk Energy, a premier developer of tubular expansion technologies, has announced the release of its 9-5/8” MetalPatch system. This system was fully qualified and field tested in the Gulf of Mexico in a deep-water application.

With this latest addition, MetalPatch tools can now cover a full range of 4-1/2” to 9-5/8” applications from corrosion isolation, well integrity, or sliding sleeves failures. Furthermore, Metal to Metal sealing offers superior high-pressure isolation from hydraulic fracturing operations.

Mohawk Energy developed the MetalPatch system to provide mechanical isolation while maintaining large inner diameters to withstand high burst and collapse pressures. The product can cover areas ranging from 30’ to 8,000’ in length.

“The 9-5/8” MetalPatch is the next step in our ongoing commitment to developing tools with greater contingency and larger diameters,” said Scott Benzie, co-founder of Mohawk Energy. “We’re thrilled to roll this product out to the market and look forward to its success.”

Image

Corporate Headquarters

Ocean News & Technology
is a publication of TSC Strategic

8502 SW Kansas Ave
Stuart, FL 34997
info@tscpublishing.com