2H Offshore Awarded Hess and Enbridge Verification Contracts for Stampede Field Development

3Location-of-Stampede-field-in-Gulf-of-Mexico2H Offshore, an Acteon company, has been awarded two separate contracts, one by Hess Corp. (Hess) and a second contract by Enbridge Energy Co. (Enbridge), to verify the design, fabrication and installation phases of the Steel Catenary Risers (SCRs) for the Stampede field development in the Gulf of Mexico.

The Stampede field is operated by Hess. Enbridge plans to build, own and operate the oil export pipeline from the Stampede tension leg platform (TLP). The subsea development is situated in Green Canyon blocks 468, 511 and 512 in the central U.S. Gulf of Mexico, in water depths of approximately 3500 ft.

The primary objective of 2H’s verification work is to verify the acceptability of the Stampede SCR design, fabrication methods and installation activities for both Hess and Enbridge, and ensure that there is consistent adherence to the relevant codes, standards and specifications. The project award follows 2H’s successful completion of the design, fabrication and installation verification work for the production SCRs in the Hess-operated Tubular Bells field development last year.

David Walters, 2H vice president, said, “2H has extensive experience and proven capability in the design of steel catenary risers, with expertise in fabrication methods and installation issues. We have completed more than 15 CVA projects, and are therefore well qualified to complete this scope of work. 2H is widely renowned for our high quality of work, and we look forward to delivering another safe and efficiently executed project on behalf of Hess and Enbridge.”

2H’s Houston office will be responsible for the contract and the execution of this work.

Image

Corporate Headquarters

Ocean News & Technology
is a publication of TSC Strategic

8502 SW Kansas Ave
Stuart, FL 34997
info@tscpublishing.com